HOTELS

Tachydomi specializes in hotel projects having years of experience in this sector. Having broken a record of building in Greece with 25000 square meters in six months, it guarantees consistency in the speed of construction of a hotel unit. With excellent organization and the latest building equipment, the delivery time is met without any deviation. The projects that Tachydomi constructs are designed in accordance with both the Greek regulations and the relevant Eurocodes, as well as the strictest ones concerning the modern methods of building perception.

A complete hotel unit is delivered with the following tasks:

  • Reinforced concrete foundation and floor
  • Masonry and reinforced concrete blocks and slabs
  • Electrical installations (piping, wiring and central panel)
  • Plumbing (water piping with central collector, drainage network up to the exit of the building)
  • Full external thermal insulation
  • Flooring
  • Sanitary Ware
  • Woodwork (interior doors, wardrobes, kitchen)
  • External aluminium frames (German profile with double glazing)
  • Heating & air conditioning installation
en_USEN