TACHYDOMI SA offers complete solutions for electricity meter column with single and double three-phase current clock.
The product is known as the current pole and is connected to the central power supply from the current network to our building, usually the telephone connection is also installed in the same cabinet. For these necessary connections, galvanized pipes are required, with a final product height of approximately 6 meters.
For the placement of the single column, a pit with a width of 1.2m, a length of 1.2m and a depth of 0.3 - 0.5m is needed. The weight of the single column is about 2 tons (including the pipe).
For the placement of the double column, a pit with a width of 1.6m, a length of 1.2m and a depth of 0.3-0.5m is needed. The weight of the double column is about 3 tons (including the pipe).
After the column is placed in the pit, concrete is poured on site in the remaining pit. The transport and placement of the column is done either by the company or by the customer. More information at info@tachydomi.gr.